DPU will oversee replacement of approximately 6,700 linear feet of 14" steel pipe installed in 1949 with a new 14" ductile iron pipe along NM-502. The existing 14" steel pipe is aged and deteriorated and experiences regular leaks. This line is a critical transmission line that conveys water from Otowi Well #4 to the Townsite area of Los Alamos.
Budget: Water Trust Board $ 2,500,000
CIP $ 383,500
Total $ 2,883,500