The chamber housing two 54” by-pass valves at the Abiquiu hydroelectric plant must be de-watered periodically to perform inspections, perform maintenance and replace equipment. The old bulkhead gates that are used to isolate the chambers are worn and mis-aligned, allowing excessive seepage during de-watering operations. Two new bulkhead gates will be fabricated to replace the old gates.