Piedra Loop Primary Electric Replacement

  • Project typeElectrical utility upgrade
  • Project scheduleSummer - Fall 2026
  • Contractor nameBixby Electric
  • Completion DateNovember 06, 2026
aerial map of Piedra Loop with red outline indicating work zone

Construction operations

  • Bixby Electric will be trenching and excavating along Piedra Loop to install electrical and fiber conduit.
  • Work will mostly occur along the shoulder, but some pavement will be disturbed as well. 
  • Work will occur along Piedra Loop, La Posa Ct, Mariposa Ct, Agila Ct.
  • This project is anticipated to be complete by November 6, weather permitting. 

Traffic control

  • Barrels and cones will be present and relocated as work progresses. 
  • Should a lane need to be temporarily closed, workers will be present to help direct traffic. 
  • Signs will be posted. 
  • Exercise caution in the area.

Location

Piedra Loop, White Rock, NM 87547  View Map

Google Map