Alerts & current conditions

Alerts

Emergency alerts

Sign up for emergency alerts so you can be notified quickly and efficiently during emergencies such as wildfires, severe weather, public safety incidents, or other urgent events.

We encourage all community members—everyone who works, recreates, goes to school, and/or lives here—to sign up to receive emergency alerts. Signing up allows you to choose how you receive alerts (text, call, email), provide multiple contact methods, customize location-based alerts, and ensure your information is accurate.

 

Sign Up for Emergency Alerts

 

Signing up is quick and easy. Select the "Sign Up for Emergency Alerts" button or text “LOSALAMOS” to 888777.

You may opt out at any time by following the unsubscribe instructions included in alert messages or by adjusting their preferences within the system.

Note: Emergency alerts from Los Alamos County’s system will come from the number 88911. This is different from the number used by LANL’s system. Residents are encouraged to read messages in their entirety, as they will contain critical instructions and situation updates.

Weather station announcements

The weather stations at Ashley Pond Park, the golf course, North Mesa Sports Complex, Overlook Park, and Piñon Splash Pad announce alerts and also serve as an emergency tool, broadcasting critical announcements during severe weather or emergencies.


Ready, Set, Go!

Current status: READY

Plan. Prepare. Stay aware.

The geography, weather patterns, and number of Wildland Urban Interface communities in New Mexico make it a state particularly threatened by devastating wildfire. As catastrophic wildfires continue to increase each year in New Mexico, make sure to protect yourself and your family—plan, prepare, and stay aware.

Ready, Set, Go!

 

Get prepared for wildfire before it strikes by remembering the 8 P's:

  • People & pets
  • Pictures & photo albums
  • PCs
  • Papers (important documents)
  • Prescriptions & medications (including pets)
  • Plastics (i.e. credit cards)
  • Personal devices (phones, tablets, & chargers)
  • Passports & IDs

My drive & street cameras

These views are provided as a courtesy. During peak traffic or severe weather events, increased usage may affect streaming capabilities. When this occurs, please try accessing the cameras at a later time.

Central & 15th (West)

View Central & 15th (West)

Central & 15th (East)

View Central & 15th (East)

Diamond & Trinity (North)

View Diamond & Trinity (North)

Diamond & Fire Station 4

Camera is temporarily down due to construction.

View Diamond & Fire Station 4

NM502 & Airport (West)

View NM502 & Airport (West) camera

NM502 & Airport (East)

View NM502 & Airport (East) camera

NM4 & Rover (South)

 

View NM4 & Rover camera

 

We do not offer computer or browser support to individuals experiencing difficulty utilizing this feature.


Construction Cone Zone

The Cone Zone image that says Los Alamos County construction news
UPDATED: August 14, 2026

Here are the current updates and traffic impacts for road construction projects and special events. Active projects will be updated as needed.

NOTE: Essential services—mail delivery, trash and recycling collection, and emergency response—will continue throughout each project. Residents and businesses may still experience large equipment and construction noise.

SAFETY TIP: Motorists and pedestrians are reminded to use caution, reduce speed near work zones, and follow designated detour routes.


Road & utility work

Questions or concerns?

County projects

 

Map of construction projects

This element requires javascript to be enabled.

Please wait while we load your map...

 


Trinity Drive Safety and ADA Improvements

 

Updates for August 10-14, 2026

Haase Contracting Company will be working on eastbound Trinity Drive from Oppenheimer Drive to 15th Street. Regular construction hours are Monday-Friday 7 a.m. - 5 p.m.

NOTES: Expect delays, especially during morning and afternoon rush hours. If you seek an alternate route, obey the posted speed limit. The speed limit within the construction zone is 25 MPH.

Remember, local businesses along Trinity Drive are OPEN and need your business!

Construction operations

Crews are removing the sidewalk on the south side of Trinity Drive between Oppenheimer and 20th Street and repouring sections of the sidewalk. They are also removing curb and gutter and pouring sidewalk ramps, valley gutters, and fillets. Access is being maintained to all businesses on the south side of Trinity Drive and access to all parking lots for these buildings is through 20th Street. Access is being provided to pedestrians for concerts taking place on the north side of Trinity Drive at Ashley Pond.

Traffic control

Trinity Drive
  • Eastbound traffic: Reduced to one outside lane from Oppenheimer Drive to 15th Street
  • Westbound traffic: Fully open at this time
20th Street
  • 20th Street: Fully open at this time

Atomic City Transit

Status of the Route 1 Downtown Circulator bus stops along Trinity Drive in the work zone

  • CLOSED: Trinity & Oppenheimer Stop # 105 (Use Timber Ridge Stop # 104 instead)
  • CLOSED: Trinity & O'Reilly's #106 (Use Trinity & 20th Stop #107 instead)
  • OPEN: Trinity & 20th Stop #107

Questions and concerns


Trinity Drive Electrical Replacement Project

map image of construction area

NOTE: Phase 1 will occur on the north side of Trinity Drive and should be completed by the end of July/early August. Phase 2 will occur on the south side of Trinity Drive and is expected to begin in early August, weather permitting. An initial press release was sent out June 12, regarding this project: Sidewalk work to begin on Trinity

Construction operations

  • Remove existing sidewalk along north side of Trinity starting at Oppenheimer Drive and extending along the Ponderosa Pines Apartments.
  • Installation of electric and fiber conduit, junction boxes, and switch sleeves.
  • Repair sidewalk, once electrical work is completed, to ADA standards.
  • Work will repeat on the south side of Trinity.

Traffic control

  • Cones will be present in roadway and lanes will be shifted to allow safe workspace.
  • Follow all work zone signs and exercise caution.

Questions and concerns


Piedra Loop Primary Electric Replacement

aerial map of Piedra Loop with red outline indicating work zone

Construction operations

  • Bixby Electric will be trenching and excavating along Piedra Loop to install electrical and fiber conduit.
  • Work will mostly occur along the shoulder, but some pavement will be disturbed as well. 
  • Work will occur along Piedra Loop, La Posa Ct, Mariposa Ct, Agila Ct.
  • This project is anticipated to be complete by November 6, weather permitting. 

Traffic control

  • Barrels and cones will be present and relocated as work progresses. 
  • Should a lane need to be temporarily closed, workers will be present to help direct traffic. 
  • Signs will be posted. 
  • Exercise caution in the area. 

Questions and concerns


H.O. Construction will begin working on Finch Street and Los Alamos Medical Center Parking lot.

Construction operations (weather permitting)

At the Finch Street/Los Alamos Medical Center East Parking Lot, crews will continue removing the stockpile, prepare the subgrade, begin grading the base for the retaining wall, and start excavating for the installation of a new water line.

Atomic City Transit – Route 1 Service Alert

Due to construction, stop 102 on Route 1 is closed due to construction until further notice. Please use the Hospital stop 101 or 103 Trinity Dr & 35th Street.

Additionally, Trinity & Oppenheimer Stop 105 and  stop 106 Trinity and Ashley Pond by the O'Reilly's are closed. Please use Timber Ridge Stop 104.

Access to both Hills apartment driveways will remain open, while the eastern Los Alamos Medical Center parking lot will be closed.

Traffic control

  • During construction, road closures, lane restrictions, and detours will be in place.
  • Follow all work zone signs and exercise caution. Access to residents will be maintained. 

Questions and concerns

Finch Street Extension and Road Improvements

 


San Ildefonso Road 8" Waterline Replacement

aerial map of approximate workzone along San Ildefonso Road

Construction operations

  • File construction will be replacing 8" cast iron pipe with 12" PVC pipeline along San Ildefonso Road.
  • This project is expected to be complete by January 2027.

Traffic control

  • During construction, sections of San Ildefonso Road will be reduced to one lane.
  • Flaggers and signage will be in place.
  • Follow all work zone signs and exercise caution.
  • Access to residents will be maintained.

Questions and concerns


East Road 14" Water Transmission Line Replacement

map image of construction area

NM Underground Utilities, Inc began work on Monday, June 8. As of Monday, July 20, work is approximately 50% complete.

NOTE: While this project will not directly impact traffic flows, motorists should exercise caution through this area.

Construction operations

  • Construction access points are east side of Fire Station 6 entrance and at the first curve in NM502.
  • Replacing 14" steel water transmission main with new 14" ductile iron transmissions line.
  • Construction will primarily occur off-road across from the Los Alamos Airport.

Traffic control

  • Barrels and concrete wall barriers in place at start and end of work zone.
  • Follow all work zone signs and exercise caution.

Questions and concerns


Longview Demolition Project

Longview Demolition Project Map

 

Demolition of three County-owned buildings located at 112, 124 and 126 Longview Drive will begin July 6th and is expected to continue through the end of September 2026.

The demolition site is located between Bonnie Dr. and the Beehive Assisted Home. In preparation for this work, the contractor installed a fence to clearly delineate the demolition site. This results in lane reduction on the road in front of the demolition site. 

Customers and deliveries will continue to have access to the business on Longview Drive, although occasional delays may occur due to construction traffic and large trucks entering and exiting the work zone.  We encourage visitors to use caution, follow posted traffic control signs, and allow a little extra travel time.

Please expect increased dump truck traffic, construction noise, and heavy equipment to operate Monday through Friday 7:00 a.m. to 9:00 p.m. Dump trucks in transit to the demolition site will be routed via NM 4, Sherwood Blvd. and Rover Blvd.

We appreciate your patience and ask that you remain alert, follow all posted signs, and avoid the fenced construction area while this work is underway.  

Traffic control

An increase in dump truck traffic, construction noise, and heavy equipment may be present Monday through Friday 7 a.m. to 9 p.m.

  • During construction, road closures, lane restrictions, and detours will be in place.
  • Follow all work zone signs and exercise caution. Access to residents will be maintained. 
NOTE: Access to business' on Longview Drive will be maintained, with occasional delays.  

Questions and concerns

 


Road Work

  

Location: El Gancho Rd. to 981 Barranca Rd. and North Mesa Road at Terry Lane and at Mendius Lane.

  • Date: August 10 - September 10, 2026
  • Time: 7:00 a.m. to 4:00 p.m. 
  • Impact: Temporary median closure and flagging operations. 
  • Work: Crews will be replacing existing manholes. Each manhole will take 24 hours to cure. Barrels will be placed on each manhole while they cure.
  • Contact: Traffic and Streets, Daniel Campos, 505-500-7321
El Gancho Road traffic control plan showing locations of manholes to be replaced

El Gancho Rd.

Barranca Road traffic control plan showing manhole replacement locations

Barranca Rd.

North Mesa Rd at Terry Lane image showing manhole replacement area

North Mesa Rd at Terry Lane

North Mesa Rd at Mendius Lane image showing location for manhole replacement

North Mesa Rd. at Mendius Lane


Concrete Work 

Location: 1351 South San Ildefonso Road

 

  • Date: August 18 - September 21, 2026
  • Time: 7:00 a.m. to 4:00 p.m. 
  • Impact: Sidewalk and shoulder closures
  • Work: Removal and replacement of two 17' swells of curb and gutter to drop inlet drain.
  • Contact: Traffic and Streets, Daniel Campos, 505-500-7321

 

Location: 3224 Villa Street

 

  • Date: August 18 -  September 21, 2026
  • Time: 7:00 a.m. to 4:00 p.m. 
  • Impact: Sidewalk closure.
  • Work: Install sidewalk and concrete steps.
  • Contact: Traffic and Streets, Matthew Salazar, 505-412-5144

 

 

 

Location: Mesa Public Library 

  • Date: August 10-14, 2026
  • Time: 7:00 a.m. to 4:00 p.m. 
  • Impact: Sidewalk closures
  • Work: Replacing sidewalks along the parking lot and in the front of the library
  • Contact: Traffic and Streets, Daniel Campos, 505-500-7321

 


Asphalt Work

Location: 45th Street between Yucca Street and Alabama Ave. 

 

  • Date: August 17 - 21, 2026
  • Time: 7:00 a.m. to 4:00 p.m. 
  • Impact: Flagging operation, lane closures.
  • Work: Asphalt paving 
  • Contact: Traffic and Streets, Matthew Salazar, 505-412-5144

 


Roadway Striping 

Location: Central Ave. painting/striping from the round about to Canyon Rd - NIGHT WORK

  • Date: August 5 - 20, 2026
  • Time: 2:00 a.m. to 6:00 a.m
  • Impact: Flagging operation 
  • Work: Painting crosswalks and markings on Central Ave.
  • Contact: Traffic and Streets, Aaron Park, 505-709-0949

 

Location: County-wide striping at public schools

  • Date: July 7-August 21, 2026
  • Time: 6:30 a.m. to 4 p.m.
  • Impact: Temporary sidewalk closures
  • Work: Striping curbs along school zones county wide.
  • Contact: Traffic and Streets, Aaron Park, 505-709-0949

Special Events


Jemez Mountain Regional Fire Project Project

Gates to Camp May Road will be closed Monday through Thursday from August 12 - September 3 for crews to install fiber optic cables.

Starting June 1, CLOSED Monday morning – 5 p.m. Thursday through rest of 2026: Camp May Road, Camp May Campground, access to nearby trails.

 


Non-County projects

 

New Mexico Gas Company Project

photo of tanker truck overlain map of its location
Operations

The New Mexico Gas Company (NMGC) is performing required pipeline integrity testing on the main natural gas transmission line through the end of July or early August. Natural gas is being supplied to the area via a virtual pipeline. While the main transmission line is out of service for testing, NMGC is delivering the County’s gas supply via the temporary virtual pipeline of liquified natural gas (LNG). The virtual pipeline consists of LNG being delivered and stored in tanker trucks, visible across from Camino Entrada. No supply disruptions to customers are anticipated. This project is expected though early September.

Traffic control
  • Jersey barriers and orange barrels are present on the east-bound shoulder. 
  • Trucks will be entering and exiting the east-bound shoulder. 
Questions and concerns

For additional details, please see the press release: 

Main Gas Pipeline Undergoing Testing

 

Los Alamos Canyon Bridge (Omega Bridge)

Substructure work on the bridge will take place between July 27, 2026 and March 2027. No impacts to traffic flow are expected.


Utilities status and planned outages

Electricity

Good. No planned outages.

Gas

Good. No planned outages.

Water

Good. No planned outages.

Sewer

Good. No planned outages.

 

Outage details

  • 8/13 @ 9:17 p.m.: 1,300 customers in White Rock without power. Crews on site, but no ETA at this time.

 

Report a utilities issue


Atomic Fiber construction

Current status: Staging materials & mobilization

 

The community broadband network is expected to begin construction in residential sections late August 2026. Construction will occur in eight phases over three years. As each phase is completed, service will become available in that area via one of the four Internet Service Providers (ISP).

Visit AtomicFiber.net to sign up to be notified when Atomic Fiber reaches your neighborhood and sign up for service with an ISP.

Phase 1

Mobilizing; residential work begins week of 8/10/26

Phase 2

Planned: Winter 2026

Phase 3

Planned: Spring 2027

Phase 4

Planned: Summer 2027

Phase 5

Planned: Fall 2027

Phase 6

Planned: Winter 2027

Phase 7

Planned: Spring 2028

Phase 8

Planned: Summer 2028

 

Phase 1 construction details

  • Construction estimated to begin around August 10.
  • Construction in the following White Rock residential neighborhoods:
    • Mirador
    • Pinion Trails
    • Pinon Estates
    • Canyon Piedras
    • La Vista
    • Chamisa Park 1&2
    • Ridge Crest 1-3
    • White Rock Canyon
    • Rover Manor
    • Valle Del Sol
    • La Senda
    • Hasta La Vista
    • Vista Encantada
    • La Senda Subdivisions

Atomic Fiber construction project page

 


Weather and storm alert system

Review the current weather conditions across the County. When lightning is detected within 10 miles of a site during operation hours, audible and visible alerts will activate. The alert remains active for 30 minutes from the most recent lightning strike, with a visible countdown timer showing when it is safe to resume outdoor activities.

Los Alamos Townsite

Ashley Pond Park

Su – Th & Sa: 10 a.m. – 7 p.m.
Fr: 10 a.m. – 9:30 p.m.

2300 Trinity Drive
Los Alamos, New Mexico 87544

Golf Course

Every day: 7 a.m. – 8 p.m.

4244 Diamond Drive
Los Alamos, New Mexico 87544

North Mesa Sports Complex

Mo – Fr: 3 p.m. – 8:30 p.m.
Sa & Su: 10 a.m. – 7 p.m.

555 North Mesa Road
Los Alamos, New Mexico 87544

 

White Rock

Overlook Park

Mo – Fr: 4 p.m. – 8 p.m.
Sa & Su: 10 a.m. – 8 p.m.

580 Overlook Road
White Rock, New Mexico 87547

Piñon Splash Pad

Every day: 10 a.m. – 8 p.m.

10 Sherwood Boulevard
White Rock, New Mexico 87547

 

 


Fire restrictions

Effective July 28, 2026: ORDER_2026-03_Rescinded-Restrictions_20260727.pdf(PDF, 98KB)

Fire Marshal Colorado Cordova with the Los Alamos Fire Department (LAFD) has announced all fire restrictions in Los Alamos County are lifted, effective June 28, 2026. The decision comes after careful evaluation of recent rainfall, fuel moisture levels, fire activity, and current and forecasted weather conditions. 

With the lifting of restrictions, residents and visitors are now welcome to enjoy outdoor activities at County parks and developed campsites. Campfires and charcoal grills are once again permitted. However, Fire Marshal Cordova strongly encourages everyone to practice caution and common sense to reduce the risk of human-caused wildfires. 

Additionally, while fire restrictions have been lifted in Los Alamos County, individuals visiting areas outside of the county still need to comply with fire restrictions set by local, state and federal authorities, including Pueblos and other counties. These measures are crucial to preventing fire incidents and safeguarding the community and its natural resources.

Additional information

Fire Marshal Colorado Cordova (505-662-8301)

 

Santa Fe National Forest Alerts

 


Closures: planned and upcoming

Current

  • Aquatic Center: The main pool is currently CLOSED for rehabilitation work with Fall 2026 ETA for reopening.

 

Upcoming

  • Betty Ehart Senior Center: July 2026 through January 2027 for HVAC replacement and interior renovations.

 


Holiday closures & operational changes

In observance of Independence Day, Los Alamos County will join other federal, state, and local governments and government offices and many services will be closed on Friday, July 3, 2026 and Saturday, July 4, 2026. For police, fire, utilities, and parks issues during the holiday, call 505-662-8222. In case of emergency, dial 9-1-1.

Atomic City Transit

  • Fixed routes: NONE
  • ACT MyRide: Available 6 a.m. - 5:30 p.m. FRIDAY, JULY 3 (To schedule, call 505-661-Ride or book on the app) and NONE on SATURDAY, JULY 4
  • Friday night concert bus service: 6:30 – 9:40 p.m. The last buses will leave for North Mesa and North Community at 9:35 p.m. and for White Rock at 9:40 p.m.
  • 4th of July Spectacular bus service: 3:00 – 10:30 p.m. Pick-up locations: Lemon Lot and White Rock Visitor Center. Shuttle parking available at Sullivan Field, Jock Lot, and Los Alamos High School main parking lot.
  • Bandelier shuttle: Normal operations in the park
  • Dispatch and Lost & Found: CLOSED

Administrative offices and services

  • Municipal Building: CLOSED
  • Customer Care (Utilities): CLOSED
  • Eco Station: OPEN FRIDAY, JULY 3 and CLOSED SATURDAY, JULY 4
  • Overlook Convenience Center: OPEN FRIDAY, JULY 3 and CLOSED SATURDAY, JULY 4
  • Trash & recycling pick-up: NONE. For those normally with Friday service, place roll carts at the curb on WEDNESDAY, JULY 1.
  • Social Services: CLOSED

Recreational and educational services

  • Libraries (Mesa and White Rock Branch: OPEN 1 - 5 p.m. FRIDAY, JULY 3 and CLOSED, SATURDAY, JULY 4
  • Aquatic Center - Leisure Lagoon: OPEN 9 a.m. - 7 p.m. FRIDAY, JULY 3 and CLOSED, SATURDAY, JULY 4
  • Piñon Pool: OPEN 7 a.m. - 7 p.m. FRIDAY, JULY 3 and OPEN 10 a.m. - 3 p.m. SATURDAY, JULY 4
  • Golf Course: OPEN 8 a.m. - 7 p.m. BOTH DAYS
  • Ice Rink: CLOSED (for the season)
  • Camp May Road: CLOSED

Observed holidays

Los Alamos County observes twelve holidays a year. If the holiday falls on a Saturday, offices are closed Friday in observance of the holiday. If the holiday falls on a Sunday, offices are closed Monday in observance of the holiday.

  • New Year's Day
  • Martin Luther King Day
  • Presidents Day
  • Memorial Day
  • Juneteenth
  • 4th of July
  • Labor Day
  • Indigenous People's Day
  • Veterans' Day
  • Thursday - Thanksgiving Day
  • Friday after Thanksgiving
  • Christmas Day

Administrative offices and courts are closed these days, though work crews are on-call 24/7 by calling 505-662-8222.