Camp May Road, campground, and surrounding trails will be closed Monday morning through 5 p.m. Thursday until the completion of the project.
Why is this project important?
September 28 UPDATE: The contractor is currently constructing four booster stations. Crews are also working to disinfection of the new water system and water tank on Pajarito before potential weather sets in. Underground fiber cables have been pulled through the conduit.
Trenching.mov
jemez-fire-8-18-26.jpeg
FY27Q1-JMFPP-Booster-Station-PC-J-Soulski.jpg
FY27Q1-JMFPP-Booster-Station-PC-J-Soulski-1.jpg
conduit-and-water-pipe-emerging-from-ground-into-future-booster-station-site-JFMPP.jpg
concrete-vault-boxes-with-manhole-lids-ready-to-be-backfilled-and-concreted-into-place-JMFPP.jpg
concreting-around-manhole-access-point-JMFPP.jpg
backfilling-trench-with-dirt-and-asphalt-JMFPP.jpg
conduit-laid-out-in-trench-JMFPP.jpg
ditch-witch-digging-trench-JMFPP.jpg
ditch-witch-trenching-along-guardrail-JMFPP.jpg
equipment-that-seams-water-pipe-together-under-canopy-tent-JMFPP.jpg
excavator-lowering-water-pipe-into-trench-JFMPP.jpg
installing-conduit-in-trench-JMFPP.jpg
installing-vault-box-JMFPP.jpg
installing-water-pipe-into-trench.jpg
linemen-in-bucket-truck-doing-work-on-power-pole-JMFPP.jpg
paving-equipment.jpg
people-installing-pumps-inside-concrete-housing-JMFPP.jpg
person-welding-sections-of-pipe-together.jpg
Removing-pavement-in-preparation-for-trench.jpg
sections-of-conduit-pipe-next-to-trench-JMFPP.jpg
spool-of-wires-pulled-through-conduit-JMFPP.jpg
two-sections-of-water-pipe-seamed-together-JMFPP.jpg
water-pipe-partially-in-trench-JMFPP.jpg
water-pipe-preparing-for-install-into-trench-JMFPP.jpg
West Road and Camp May Road, Los Alamos, NM 87544 View Map
West Road and Camp May Road , Los Alamos, NM 87544