Ashley Pond Electrical Pedestal Installation The Ashley Pond Electrical Pedestal Installation project will enhance the park by adding four new electrical pedestals along Trinity Drive. The project will expand the park’s capacity to support food trucks and community events.
Ashley Pond Park Safety Improvements This project is addressing the safety concern of vehicle traffic from Trinity Drive impacting crowds gathered in Ashley Pond Park.
Betty Ehart Renovations and HVAC Replacement The Betty Ehart Senior Center requires renovations, improvements, and adaptations that are consistent with those of an aging building with 26 years of operation.
Conceptual Shade Structure for the Ice Rink Public Works is exploring potential shade structure options for the Los Alamos Ice Rink. This initiative aims to enhance the facility’s usability and extend the ice and roller skating seasons.
Fire Station No. 4 Replacement Replace Fire Station 4 at its current location with a design tailored to LAFD needs. The project includes design development, construction documents, bidding, and construction administration. The new station will enhance efficiency, turnout speed, ease of use, and firefighter health and well-being.
Golf Course Pole and Netting Project Current Updates See the current status of the Golf Course Pole and Netting Project , including construction updates and impacts on the public.
Golf Course Practice Range Pole and Netting Project This project is now complete pending acceptance of the final payment by the contractor.
Golf Course Renovation Project Overall, the project has been completed. Some detailed work has been extended into the winter. The restrooms have been set up at their respective sites and will be ready for use when the season begins this spring. Maintenance duties have been transferred to the County golf staff.
Ice Rink Temporary Chiller The temporary chiller was removed from the ice rink on May 21,2025. On the same date, the permanent chiller was delivered to the Ice Rink and placed in its final resting location.
Manhattan Era Dormitory Renovations Rehabilitate the historic Women's Dormitory Building to accommodate offices for the National Parks Office while adhering to the U.S. Department of Interior and State Historic Preservation standards.
Mesa Public Library Siding Replacement The Mesa Public Library building, constructed in 1994, has been a cornerstone of the Los Alamos community for over three decades. Over this period, the building’s siding has been exposed to various weather conditions. This exposure has caused significant fading and deterioration, prompting the need for a replacement.
Olympic Pool Restoration & Mechanical System Improvements The Los Alamos County Community Services Department has scheduled the resurfacing of the Larry R. Walkup Aquatic Center Olympic pool from March 2026 to January 2027. The resurfacing project involves removing and replacing the existing plaster shell within the pool. During the project's duration, both the Olympic and Therapy pools will be closed. The Leisure Lagoon is scheduled to remain open.
Olympic pool restoration and mechanical systems improvements The plaster shell of the Olympic pool is the original surface from when it was built in the 1980s, and well beyond its life-expectancy. During the replastering work, it was found that the pumps and filters needed to be replaced before the scheduled 2027 target.
White Rock Visitor Center Outdoor Bathrooms Construction of outdoor restrooms and pavilion facilities at the White Rock Visitor Center.