Alerts & current conditions

Alerts

Emergency alerts

Sign up for emergency alerts so you can be notified quickly and efficiently during emergencies such as wildfires, severe weather, public safety incidents, or other urgent events.

We encourage all community members—everyone who works, recreates, goes to school, and/or lives here—to sign up to receive emergency alerts. Signing up allows you to choose how you receive alerts (text, call, email), provide multiple contact methods, customize location-based alerts, and ensure your information is accurate.

 

Sign Up for Emergency Alerts

 

Signing up is quick and easy. Select the "Sign Up for Emergency Alerts" button or text “LOSALAMOS” to 888777.

You may opt out at any time by following the unsubscribe instructions included in alert messages or by adjusting their preferences within the system.

Note: Emergency alerts from Los Alamos County’s system will come from the number 88911. This is different from the number used by LANL’s system. Residents are encouraged to read messages in their entirety, as they will contain critical instructions and situation updates.

Weather station announcements

The weather stations at Ashley Pond Park, the golf course, North Mesa Sports Complex, Overlook Park, and Piñon Splash Pad announce alerts and also serve as an emergency tool, broadcasting critical announcements during severe weather or emergencies.


Ready, Set, Go!

Current status: READY

Plan. Prepare. Stay aware.

The geography, weather patterns, and number of Wildland Urban Interface communities in New Mexico make it a state particularly threatened by devastating wildfire. As catastrophic wildfires continue to increase each year in New Mexico, make sure to protect yourself and your family—plan, prepare, and stay aware.

Ready, Set, Go!

 

Get prepared for wildfire before it strikes by remembering the 8 P's:

  • People & pets
  • Pictures & photo albums
  • PCs
  • Papers (important documents)
  • Prescriptions & medications (including pets)
  • Plastics (i.e. credit cards)
  • Personal devices (phones, tablets, & chargers)
  • Passports & IDs

My drive & street cameras

These views are provided as a courtesy. During peak traffic or severe weather events, increased usage may affect streaming capabilities. When this occurs, please try accessing the cameras at a later time.

Central & 15th (West)

View Central & 15th (West)

Central & 15th (East)

View Central & 15th (East)

Diamond & Trinity (North)

View Diamond & Trinity (North)

Diamond & Fire Station 4

Camera is temporarily down due to construction.

View Diamond & Fire Station 4

NM502 & Airport (West)

View NM502 & Airport (West) camera

NM502 & Airport (East)

View NM502 & Airport (East) camera

NM4 & Rover (South)

 

View NM4 & Rover camera

 

We do not offer computer or browser support to individuals experiencing difficulty utilizing this feature.


Construction Cone Zone

The Cone Zone image that says Los Alamos County construction news
UPDATED: October 12, 2026

Here are the current updates and traffic impacts for road construction projects and special events. Active projects will be updated as needed.

NOTE: Essential services—mail delivery, trash and recycling collection, and emergency response—will continue throughout each project. Residents and businesses may still experience large equipment and construction noise.

SAFETY TIP: Motorists and pedestrians are reminded to use caution, reduce speed near work zones, and follow designated detour routes.


Road & utility work

Questions or concerns?

County projects

 

Map of construction projects

This element requires javascript to be enabled.

Please wait while we load your map...

 

7 Result(s) Found

Water Transmission Line Repair at Pueblo Complex

Announcement : October 9, 2026
- Asphalt and curb repaired.
- Sidewalk expected to be poured 10/9
- Traffic control expected to be removed Tuesday, 10/13

Contact: Abbey Hayward
505-663-1779
abbey.hayward@losalamosnm.gov
 
Target completion date:
Google Map


Trinity Drive Safety and ADA Improvements

 

Updates for October 12-16, 2026

Haase Contracting Company is working on eastbound Trinity Drive from Oppenheimer Drive to Knecht Street and on westbound Trinity Drive from 15th Street to Oppenheimer Drive. Regular construction hours are Monday-Friday 7 a.m.-5 p.m.

NOTES: Expect delays, especially during morning and afternoon rush hours. If you seek an alternate route, obey the posted speed limit. The speed limit within the construction zone is 25 MPH.

Remember, local businesses along Trinity Drive are OPEN and need your business!

Construction operations

Crews are expected to open driveways where new concrete has been poured this week but are contimuing planning for the new gas line. Also, 20th Street is closed on the south side of Trinity Drive. Businesses can use the driveway to the west to access parking lots in the area. Eastbound traffic is reduced to one lane from Oppenheimer Drive to Knecht Street. On the north side of Trinity Dive (westbound) crews have extended the work zone to 15th Street. They are continuing to work on sidewalks, curb and gutter and planning for a new water line. Westbound traffic is reduced to one lane from 20th Street to Oppenheimer Drive. Access is being maintained to all businesses on both sides of Trinity Drive.

NOTE: Crews are expected to work extended hours, into the evening, on Wednesday, October 14 and Thursday, October 15.

Traffic control

Trinity Drive
  • Eastbound traffic: Reduced to one INSIDE lane from Oppenheimer Drive to 20th Street
  • Westbound traffic: Reduced to one INSIDE lane from Oppenheimer Drive to Knecht Street
20th Street
  • 20th Street: CLOSED south of Trinity Drive; use driveway west of 20th to access businesses

Atomic City Transit

Status of the Route 1 Downtown Circulator bus stops along Trinity Drive in the work zone
  • Open: The bus stop at 20th Street and Trinity Drive is open     
  • Open: The bus stop at Elks Lodge, 1601 Trinity Drive, is open
  • Open: The bus stop in front of O’Reilly Auto Parts, 2373 Trinity Drive, is open
  • Open: The bus stop in front of Sonic Drive-In, 1695 Trinity Drive, is open
  • Open: The bus stop in front of the fuel station at Smith's Food & Drug is closed
  • Closed: The bus stop at Oppenheimer and Trinity Drive is closed

Crews are continuing to remove sidewalk and install conduit on the south side of Trinity Drive. The crew is asking motorists NOT to turn left onto Timber Ridge Road when heading west on Trinity Drive to keep traffic flowing.

Questions and concerns


Trinity Drive Electrical Replacement Project

map of Trinity from Oppenheimer to Timber Ridge with work zone marked in red box

NOTE: Phase 1 has been completed. Phase 2 is active on the south side of Trinity Drive, weather permitting. An initial press release was sent out June 12, regarding this project: Sidewalk work to begin on Trinity

Construction operations

  • North side of Trinity Drive is complete, as of August 21.
  • Crews will be working in the south side intersection of Trinity Drive and Oppenheimer Road through early October: removing sidewalk and installing fiber and electric conduit. 

Traffic control

  • To ease flow of traffic, please do not turn left onto Timber Ridge Road during high traffic times (there is currently no dedicated turn lane). Drivers are encouraged to only make the right turns onto Timber Ridge Road.  
  • Cones will be present in roadway and lanes will be shifted to allow safe workspace.
  • Follow all work zone signs and exercise caution.

Questions and concerns


Water Transmission Line Repair at Pueblo Complex

pueblo complex aerial map.png

Construction operations

  • Water leak reported on Friday, Sept 18. Water Production crews repaired the leak.
  • As of Oct 9, asphalt and curb repaired. The section of sidewalk is expected to be poured Oct 9 and traffic control removed by Tuesday, Oct 13. 
  • Click here for Google Map location

Traffic control

  • Right, north-bound lane is closed.
  • Orange barriers in place at start and end of work zone.
  • Sidewalk next to work zone is closed. 
  • Follow all work zone signs and exercise caution.

Questions and concerns

 


Piedra Loop Primary Electric Replacement

aerial map of Piedra Loop with red outline indicating work zone

Construction operations

  • Bixby Electric will be trenching and excavating along Piedra Loop to install electrical and fiber conduit.
  • Work will mostly occur along the shoulder, but some pavement will be disturbed as well. 
  • Work will occur along Piedra Loop, La Posa Ct, Mariposa Ct, Agila Ct.
  • This project is anticipated to be complete by November 6, weather permitting. 

Traffic control

  • Barrels and cones will be present and relocated as work progresses. 
  • Should a lane need to be temporarily closed, workers will be present to help direct traffic. 
  • Signs will be posted. 
  • Exercise caution in the area. 

Questions and concerns


H.O. Construction will continue working on Finch Street and Los Alamos Medical Center Parking lot.

Construction operations (weather permitting)

Finch Street/ Los Alamos Medical Center Parking Lot (East)

  • Crews will continue preparing the subgrade
  • Crews will begin to place asphalt near Trinity Drive and Los Alamos Medical Center East parking lot.
  • Crews will countinue trenching and install conduit for streetlights on the east parking area.

Atomic City Transit

Status of the Route 1 Downtown Circulator bus stops along Finch and Trinity Drive in the work zone

  • OPEN: Trinity & Oppenheimer Stop # 105 (Use Timber Ridge Stop # 104 instead)
  • OPEN: The bus stop in front of the fuel station at Smith's Food & Drug is closed
  • CLOSED: Bus stop closed near Los Alamos Medical Center
  • OPEN: Trinity & O'Reilly's #106 (Use Trinity & 20th Stop #107 instead)
  • CLOSED: Trinity & 20th Stop #107
  • OPEN: Trinity & Elks Lodge

Traffic control

  • Access to both Hills apartment driveways will remain open
  • Eastern Los Alamos Medical Center parking lot will be closed.

Questions and concerns

Finch Street Extension and Road Improvements

 


San Ildefonso Road 8" Waterline Replacement

aerial map of approximate workzone along San Ildefonso Road

Construction operations

  • As of Oct 9, concrete work for sidewalks should be finished early in the week of Oct 12. 
  • File construction will be replacing 8" cast iron pipe with 12" PVC pipeline along San Ildefonso Road.
  • This project is expected to be complete by January 2027.

Traffic control

  • Cones will be around active work zones on the shoulders.
  • Sections of sidewalk remain closed.
  • Follow all work zone signs and exercise caution.
  • Access to residents will be maintained.

Questions and concerns


East Road 14" Water Transmission Line Replacement

map image of construction area

NM Underground Utilities, Inc began work on Monday, June 8. 

NOTE: While this project will not directly impact traffic flows, motorists should exercise caution through this area.

Construction operations

  • Construction access points are east side of Fire Station 6 entrance and at the first curve in NM502.
  • Water line is installed and tie-ins have been completed. 
  • Construction will primarily occur off-road across from the Los Alamos Airport.

Traffic control

  • Follow all work zone signs and exercise caution.

Questions and concerns

 

Road Work

Location: South San Ildefonso Rd. near Camino Redondo
Work: Crews will be paving 
Date: October 5-19 2026
Traffic Effect: Flagging operations and shoulder closures
Contact: Daniel Campos, Streets Superintendent, 505-500-7321

 

Location: North Mesa Rd between Loma Linda Dr and the roundabout.
Work: Crews will be laying millings on the shoulder alongside the roadway. 
Date: October 5-9, 2026
Traffic Effect: Temporary sidewalk closures and flagging operations.
Contact: Daniel Campos, Streets Superintendent, 505-500-7321

 

Location: San Ildefonso Rd near El Gancho
Work: Crews will be placing millings on the shoulder alongside the roadway.
Date: October 27-11, 2026
Traffic Effect: Temporary sidewalk and shoulder closures and flagging operations.
Contact: Daniel Campos, Streets Superintendent, 505-500-7321

 



Concrete Work

Location: The intersection of Grand Canyon Drive and Aragon Ave.
Work: Weather permitting crews will be repairing adjusting manholes
Date: October 13- November 13, 2026
Traffic Effect: Flagging operation 
Contact: Daniel Campos, Streets Superintendent, 505-500-7321

 

Location: Meadow Lane between Hacienda Drive and Mimbres Lane
Work: Weather permitting crews will be repairing sidewalks across from Chamisa Elementary School. 
Date: September 21- October 2, 2026
Traffic Effect: Temporary sidewalk closures and shoulder closures
Contact: Daniel Campos, Streets Superintendent, 505-500-7321

 

Location: Grand Canyon Drive at Monte Vista Street
Work: Weather permitting crews will be repairing sidewalks.
Date: September 21- October 2, 2026
Traffic Effect: Temporary sidewalk closures and shoulder closures.
Contact: Daniel Campos, Streets Superintendent, 505-500-7321

 

Location: 2488 & 2486 45th Street
Work: Weather permitting crews will be installing concrete aprons. 
Date: September 21- October 18, 2026
Traffic Effect: Temporary sidewalk closures and shoulder closures
Contact: Franco's Builders LLC. Ernesto Franco at 505-927-8189

 


 

H.O. Construction will continue working on Finch Street and Los Alamos Medical Center Parking lot.

Construction operations (weather permitting)

Finch Street/ Los Alamos Medical Center Parking Lot (East)

  • Crews will continue preparing the subgrade.
  • Crews will begin installing sidewalk near Trinity Drive.
  • Crews will continue installing conduit on the southside of the east parking lot.

Atomic City Transit

Status of the Route 1 Downtown Circulator bus stops along Finch and Trinity Drive in the work zone

CLOSED: Trinity & Oppenheimer Stop # 105 (Use Timber Ridge Stop # 104 instead) OPEN: Trinity & O'Reilly's #106 (Use Trinity & 20th Stop #107 instead) CLOSED: Trinity & 20th Stop #107 CLOSED: Trinity & Elks Lodge CLOSED: Bus stop closed near Los Alamos Medical Center

Traffic control

 

  • During construction, road closures, lane restrictions, and detours will be in place.
  • Follow all work zone signs and exercise caution. Access to residents will be maintained. 

Questions and concerns

Finch Street Extension and Road Improvements

Special Events


Jemez Mountain Regional Fire Project Project

Camp May Road will be closed Monday, October 12. Crews will be working. 

Starting June 1, CLOSED Monday morning – 5 p.m. Thursday through rest of 2026: Camp May Road, Camp May Campground, access to nearby trails.

 


Non-County projects

9th Street at 901 Trinity Dr Underground Bore

October 12 - 23 Cablecom, LLC will be performing an underground bore on 9th Street at the intersection of 9th Street and Trinity Drive by 901 Trinity Drive and across Trinity Drive at 9th Street. Work will begin daily at 7:00 a.m. and continue until 6:00 p.m. There will be sidewalk closures along the South side of Trinity Drive and lane shifts on Trinity Drive Eastbound. For more information regarding this project contact David Kozlowski with Cablecom, LLC at 505-417-0955.

9th Street and Trinity Drive traffic control map showing location of underground bore and traffic control

 

Los Alamos Canyon Bridge (Omega Bridge)

Substructure work on the bridge will take place between July 27, 2026 and March 2027. No impacts to traffic flow are expected.


Utilities status and planned outages

Electricity

Light bulb that is green because it works

All systems go!

No planned outages


Gas

Image of a flame with a smiling face that is blue for good or cool

All systems go!

No planned outages


Sewer

Image of a poo that is smiling and is brown for good

All systems go!

No planned outages


Water

Image of a water droplet with a smile that is blue for good

All systems go!

No planned outages


 

Map of any known utility outages

This element requires javascript to be enabled.

Please wait while we load your map...

 

Report a utilities issue


Atomic Fiber construction

Map showing the 8 phases of the broadband network build.

 

Phase Status Notes

Phase 1

Yellow background with a white digging machine illustration and the text

White Rock
  • 17,500 feet of fiber optic cut into this phase.

  • Upcoming: Sierra Vista Drive

  • Completed: Karen Cir, Grand Canyon to Sierra Vista, La Paloma, Mesa Verde, Yosemite, La Vista, Monte Vista, Valle Vista, and Canyon Vista

Phase 2

Illustration of nodes connected with lines and the text

Planned construction
Winter of 2026-27

Phase 3

Illustration of nodes connected with lines and the text

Planned construction
Spring of 2027

Phase 4

Illustration of nodes connected with lines and the text

Planned construction
Summer of 2027

Phase 5

Illustration of nodes connected with lines and the text

Planned construction
Fall of 2027

Phase 6

Illustration of nodes connected with lines and the text

Planned construction
Winter of 2027-28

Phase 7

Illustration of nodes connected with lines and the text

Planned construction
Spring of 2028

Phase 8

Illustration of nodes connected with lines and the text

Planned construction
Summer of 2028

Visit AtomicFiber.net to sign up to be notified when Atomic Fiber reaches your neighborhood and sign up for service with an ISP.

Atomic Fiber construction project page

 


Weather and storm alert system

Review the current weather conditions across the County. When lightning is detected within 10 miles of a site during operation hours, audible and visible alerts will activate. The alert remains active for 30 minutes from the most recent lightning strike, with a visible countdown timer showing when it is safe to resume outdoor activities.

Los Alamos Townsite

Ashley Pond Park

Su – Th & Sa: 10 a.m. – 7 p.m.
Fr: 10 a.m. – 9:30 p.m.

2300 Trinity Drive
Los Alamos, New Mexico 87544

Golf Course

Every day: 7 a.m. – 8 p.m.

4244 Diamond Drive
Los Alamos, New Mexico 87544

North Mesa Sports Complex

Mo – Fr: 3 p.m. – 8:30 p.m.
Sa & Su: 10 a.m. – 7 p.m.

555 North Mesa Road
Los Alamos, New Mexico 87544

 

White Rock

Overlook Park

Mo – Fr: 4 p.m. – 8 p.m.
Sa & Su: 10 a.m. – 8 p.m.

580 Overlook Road
White Rock, New Mexico 87547

Piñon Splash Pad

Every day: 10 a.m. – 8 p.m.

10 Sherwood Boulevard
White Rock, New Mexico 87547

 

 


Fire & smoke

Nearby wildfires

No results found. Please try searching again.

 

Smoke & air quality

AirNow

Fire & Smoke Viewer

 

Fire restrictions

Effective July 28, 2026: ORDER_2026-03_Rescinded-Restrictions_20260727.pdf(PDF, 98KB)

Fire Marshal Colorado Cordova with the Los Alamos Fire Department (LAFD) has announced all fire restrictions in Los Alamos County are lifted, effective June 28, 2026. The decision comes after careful evaluation of recent rainfall, fuel moisture levels, fire activity, and current and forecasted weather conditions. 

With the lifting of restrictions, residents and visitors are now welcome to enjoy outdoor activities at County parks and developed campsites. Campfires and charcoal grills are once again permitted. However, Fire Marshal Cordova strongly encourages everyone to practice caution and common sense to reduce the risk of human-caused wildfires. 

Additionally, while fire restrictions have been lifted in Los Alamos County, individuals visiting areas outside of the county still need to comply with fire restrictions set by local, state and federal authorities, including Pueblos and other counties. These measures are crucial to preventing fire incidents and safeguarding the community and its natural resources.

Additional information

Fire Marshal Colorado Cordova (505-662-8301)

 

Santa Fe National Forest Alerts

 


Atomic City Transit

This is where you can find the latest updates on changes in service, temporary closures, and re-routes.

Currently under development


Closures & operational changes

Holiday

In observance of Indigenous Peoples Day, Los Alamos County will be closed on Monday, October 12. For police, fire, utilities, and parks issues during the holiday, call 505-662-8222. In case of emergency, dial 9-1-1.

Atomic City Transit

  • Fixed routes: NONE
  • ACT MyRide: Will operate from 6 a.m. to 5:30 p.m. Call 505-661-RIDE (7433) or use the app to schedule.
  • Bandelier shuttle: Normal operations in the park
  • Dispatch and Lost & Found: Call 505-661-RIDE (7433) to schedule MyRide.

Administrative offices and services

  • Municipal Building: CLOSED
  • Customer Care (Utilities): CLOSED
  • Eco Station and Overlook Convenience Center: CLOSED
  • Trash & recycling pick-up: NONE. If the observed date falls on your normal trash day, please place your materials out on Wednesday, Oct. 14.
  • Social Services: CLOSED

Recreational and educational services

  • Los Alamos Public Library: OPEN 1 - 5 p.m.
  • Aquatic Center - Leisure Lagoon: OPEN 1 - 5 p.m.
  • Golf Course:Open normal business hours
  • Ice Rink: CLOSED (for the season)
  • Camp May Road: CLOSED

Observed holidays

Los Alamos County observes twelve holidays a year. If the holiday falls on a Saturday, offices are closed Friday in observance of the holiday. If the holiday falls on a Sunday, offices are closed Monday in observance of the holiday.

  • New Year's Day
  • Martin Luther King Day
  • Presidents Day
  • Memorial Day
  • Juneteenth
  • 4th of July
  • Labor Day
  • Indigenous Peoples' Day
  • Veterans' Day
  • Thursday - Thanksgiving Day
  • Friday after Thanksgiving
  • Christmas Day

Administrative offices and courts are closed these days, though work crews are on-call 24/7 by calling 505-662-8222.


Current closures